Municipality of Zenica allocated a land lot of 45’861 m2 within the industrial zone of Zenica required for construction of KTG Zenica. The site clearance works were performed successfully by the local company “Geosonda” d.o.o. Zenica on 20th April 2012. The site is a brown field area which was earlier used as a part of the steel plant. The former buildings on that land are demolished and the material was transported off-site and for the leveling purpose new land was brought on site in the quantity of 58’000 m³